foundation-banner_20161115192834

Progress Continues On Lynn Creek Crossing

John Foster

They’re rollin’ rollin’ rollin’! The dump trucks, that is. From the borrow pit, down to Highway 330, south to the 4 way stop, down Beaver Road hill and down West Cliff to the Lynn Creek crossing, they will carry thousands of yards of fill to build up the crossing to the desired level. If you live in the area of Beaver Hill, you’re going to hear the thump, thump, thump of the “Jake Brakes” as they slow the heavy trucks to a safe speed without overheating their wheel brakes. It’s the sound of progress. Photos by John Foster and Gail Carlo.

20131230_162459

Lynn Creek 12-31(2)  Lynn Creek 12-31(4)

 

Speak Your Mind

*